Wyandot Solar


Type of Construction

Build 10.01 MW (AC) Photovoltaic (PV) Facility with the following site work:

  • Construct road ways and storage areas for facility
  • Reclaim storage areas at end of project
  • Seed and landscape entire facility
  • Install direct buried posts for array racking
  • Install racking to house PV modules
  • Install PV Modules
  • Install PV Inverters
  • Install A/C medium voltage collector cable
  • Install all D/C cabling for facility
  • Install overhead distribution line from PV to facility to utility interconnection point

Project Size

80 acres of land consumed by the facility and construction area.

Contract Value

$4.4 million

Facility Features

  • 12,736 posts driven by Vaughn Industries to serve as PV array foundations
  • 3,184 aluminum racks installed by Vaughn Industries on posts to house PV Modules
  • 159,200 PV Modules Installed by Vaughn Industries
  • >1.2 million feet of PV array feeder cable installed by Vaughn Industries
  • Approximately 135,500 feet of D/C feeder cable installed by Vaughn Industries
  • Approximately 20,000 feet of A/C medium voltage cable installed by Vaughn Industries
  • Approximately 5 miles of overhead distribution to connect PV facility to utility

Project Duration

From late October 2009 to late May 2010: 7 months total.

Percentage of Self-Performed Work

Vaughn Industries completed approximately 90% of all work involved.

Construction Opportunities

Several RFP’s were sent to various union and non-union companies for site work, fence, landscaping activities, and various other tasks for the project.  The following non-union companies were awarded various tasks for the project-Fremont Fence Company (fence work), Koehler Engineering (surveying services), Danner’s Towing & Recycling (dunnage refuse), Double K Sanitations (dunnage refuse), Kirby’s Sand and Gravel (trucking services and material supply), Machinery Movers (crane operations) and Shaferly Excavating (directional drilling services).