- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
- Project Description: Vaughn Industries crews working to help restore power for residents after Hurricane Laura.
Hurricane Laura
Storm Work
Location: Upper Sandusky & Kirby, Ohio
- Duties Performed: This project consist of replacing old wooden structures with new steel pier foundation structures and replacing old conductors with a new double circuit T2 Hawk ACSR conductor with 96 Fiber OPGW and a 7#8 shield wire.
- Duties Performed: This project consist of replacing old wooden structures with new steel pier foundation structures and replacing old conductors with a new double circuit T2 Hawk ACSR conductor with 96 Fiber OPGW and a 7#8 shield wire.
- Duties Performed: This project consist of replacing old wooden structures with new steel pier foundation structures and replacing old conductors with a new double circuit T2 Hawk ACSR conductor with 96 Fiber OPGW and a 7#8 shield wire.
- Duties Performed: This project consist of replacing old wooden structures with new steel pier foundation structures and replacing old conductors with a new double circuit T2 Hawk ACSR conductor with 96 Fiber OPGW and a 7#8 shield wire.
- Duties Performed: This project consist of replacing old wooden structures with new steel pier foundation structures and replacing old conductors with a new double circuit T2 Hawk ACSR conductor with 96 Fiber OPGW and a 7#8 shield wire.
Melmore to Tiffin Center
Location: Melmore/Tiffin, Ohio
Type of Work: Transmission Line Rebuild
Size of Project: 7.15 Miles of Line
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
- Duties Performed: Setting steel transmission poles on foundations, setting direct embedded steel pole, Rerouting transmission line and retiring transmission line, retiring a switch pole, and building a temporary build around for the distribution.
AEP Kalida Station Expansion
Location: Kalida, Ohio
Type of Work: A new station bay is being added at the Kalida Station, requiring T-line to relocate 3 lines
Fostoria - East Lima 138KV Transmission Line
Location: Arcadia, Ohio
Type of Work: Rerouting an existing 138KV transmission line to tie into the new Ebersole Substation.
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
- Duties Performed: Installing new ductile iron poles with 336 Acsr, 3/0 acsr, and 1/0 acsr conductors
Northwestern
Electric Coop
Location: Bryan, Ohio
Type of Work: Design Build
Size of Project: 69 Kv Transmission Line with 12.47 KV Distribution Underbuild
East Lima – Richland 138KV Transmission Line
Location: Leipsic, Ohio
Type of Work: Replacing H Structures
Scio to Jewett 69Kv
Location: Scio, Ohio
Type of Work: The scope of work was to replace all wooden structures with new steel poles, the new poles varied in sizes from 100’ all the way up to 125’.
Size of Project: 10 Mile of 69Kv
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
- Duties Performed: SWPPP, Concrete Pier Foundations, Self-Supporting Steel Poles, Direct Embed Steel Poles and 959 TW conductor installation with an OPGW and 7#8 staic for a 138 KV transmission line rebuild.
Tiffin Center to Fremont Center
Location: Tiffin, Ohio
Type of Work: Transmission Line Rebuild
Size of Project: 12.6 Miles of Line