This Greenfield project is a 69KV to 12KV substation that is part of the ABC master project for AEP. The ABC Master plan includes multiple substations, rebuilding of 25 miles of transmission line and 10 miles of new transmission line. Vaughn Industries provided a 9 acre stoned lot in the heart of the ABC project to serve as the laydown yard for material and to prefabricate as much equipment as possible, creating cost and time savings. This “Prefab” Yard is the first of its kind for electrical transmission and distribution.

PROJECT PHOTO GALLERY

Awarded Packages:

Electrical:
69kv bus
Circuit breakers
Switches
69kv to 12kv Transformer
Prefabrication
Dis-Tran Bay
D.I.C.M.
Technology
3D Modeling/VDC/CAD