Completed electrical install of a 2.45 MW Ballasted DC Solar array that ties directly into Lexmark’s main headquarters located in Lexington, KY.  Vaughn also installed a 3.2kw DC research array at the facility for the University of Kentucky so students can conduct research and testing. 

An additional adder to the site was a 2.5KW DC Smartflower array system that follows the sun from sunrise to sunset and resembles a blooming flower.  

PROJECT PHOTO GALLERY

Awarded Packages:

Electrical Installation: 

5,520 First Solar Modules
PV & LV Cabling
Medium Voltage Installation
3,000 Manhours