The 192,000 sq ft high school is replacing the old “Ross” high school built in 1958. The new high school is LEED silver and includes the state of the art technologies and MEP systems, along with a new varsity gym and 700 seat performing arts center.

PROJECT PHOTO GALLERY

Awarded Packages:

Electrical: 

Power
Site Lighting
LED Lighting
Lighting Controls
Security System
Sound Systems
AV Systems
Paging System
Stage Lighting
Fire Alarm
CCTV
Technology