Designed and Installed new fiber backbone from the Control Building’s MER (Main Equipment Room) to each building’s TR (Technology Rooms) utilizing eABF fiber.

This included new pathways throughout the facility and the site as well as all new fiber cabling being installed, terminated and certified.

PROJECT PHOTO GALLERY

Awarded Packages

Technology
Fiber Backbone
eABF Fiber
Pathways
Terminations
Certification